8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
8th July 2005 |
Picture depicting one of the former works locomotives |
Loading some of the collected track fixings on 12th July 2005 |
Some of the bullhead rail awaiting collection on 12th July 2005 |
The former access route from the site to the BR(W) mainline viewed on 12th July 2005 |
The first batch of bullhead rail being loaded for transporting to HK on 13th July 2005 |
A straight rail section is recovered on 15th July 2005 |
A straight rail section is recovered on 15th July 2005 |
Part of a point (turnout) is recovered on 15th July 2005 |
The wheel flange lubricator recovered on 15th July 2005 |
One of the buffer stops that awaits dismantling on 15th July 2005 |
Some of the recovered point (turnout) components at Horsted Keynes on 13th August 2005 |
Some of the recovered flat bottom rail at Horsted Keynes on 13th August 2005 |
Some of the recovered bullhead rail at Horsted Keynes on 13th August 2005 |
| | | |