The spoil being unloaded into the 'triangle' at Horsted Keynes on 7th November 2006
The spoil being unloaded into the 'triangle' at Horsted Keynes on 7th November 2006
Bluebell Railway - Northern Extension (Kingscote to Imberhorne Lane Bridge)
British Heritage Railways
The spoil being unloaded into the 'triangle' at Horsted Keynes on 7th November 2006Previous | NextView from the brakevan as the spoil train passes over New Coombe Bridge on 7th November 2006

Added on 7th November 2006, has been viewed 2038 times